Boulder County Jail – Biomass Upgrade

Contract With/Owner:

Contract Amount:

Completion Year:

Boulder County

$488,944

2011

Hooked up piping to a new owner-supplied biomass boiler.  The boiler was installed in a new dedicated building which required us to run new hot water piping underground to the existing hot water system in the jail.  Scope of work also included furnishing and installing two new chillers (one 200-ton and one 100-ton) with associated piping, pumps and VFDs.  Furnished and installed two 6” reduced pressure backflow preventers at the main water entry.