UCD Utility Vault 3.2 Emergency Replacement

Contract With/Owner:

Original Contract:

Completion Year:

State of Colorado, University of Colorado   

$207,350

2014

Plumbing for renovation of 27 student restrooms in the dormitory.  Re-piped and replPhase #1 – Demo’d existing steam vault and replaced steam, condensate, chilled water supply and chilled water return piping with new pre-insulated piping.

Phase #2 – Removed and replaced steam and condensate lines to Buildings 401 and 402. aced all of the fixtures.